On which floor do you need demolition?
Above 20th
Is there a lift in your building?
Elevator available
What type of demolition work?
Others, 只拆浴缸
Does the work require work-at-height safety measures?
No
What is the square footage of the area that needs demolition work?
200-500 sq ft
Please briefly describe the scope of work (optional)
拆除跟原裝尺寸的浴缸,然後更換同尺寸新浴缸。
What time do you prefer to have the service?
Any time
Anything else that we need to know?
Yes, 安裝浴缸前,順便通通浴缸底部警報喉,因為已淤塞,如果唔通去水喉,日後浴缸出現滲漏,底部有變成水池,不能去水。
Where is your location?
New Territories,Tsuen Wan