On which floor do you need demolition?
1st-5th floor
Is there a lift in your building?
No elevator
What type of demolition work?
Tiled wall or flooring
Waste disposal / removal
Waste disposal / removal
Does the work require work-at-height safety measures?
No
What is the square footage of the area that needs demolition work?
<200 sq ft
Do you want to add photos to show the work needed? (optional)

Please briefly describe the scope of work (optional)
清拆及棄置塑膠地板 , 清理膠水漬
What time do you prefer to have the service?
Any time
Anything else that we need to know?
No
Where is your location?
Hong Kong Island,Central and Western