On which floor do you need demolition?
1st-5th floor
Is there a lift in your building?
No elevator
What type of demolition work?
Tiled wall or flooring
Others, 天台
Others, 天台
Does the work require work-at-height safety measures?
Requires working at height safety measures
What is the square footage of the area that needs demolition work?
500-1,000 sq ft
What time do you prefer to have the service?
Any time
Anything else that we need to know?
No
Where is your location?
Kowloon,Kowloon City