On which floor do you need demolition?
1st-5th floor
Is there a lift in your building?
No elevator
What type of demolition work?
Bathroom
Waste disposal / removal
Door / window
Waste disposal / removal
Door / window
What is the square footage of the area that needs demolition work?
500-1,000 sq ft
Please briefly describe the scope of work (optional)
舊唐樓打拆還原
What time do you prefer to have the service?
Any time
Anything else that we need to know?
No
Where is your location?
Kowloon,Kowloon City