On which floor do you need demolition?
6th-10th floor
Is there a lift in your building?
Elevator available
What type of demolition work?
Others, 冷氣機
Does the work require work-at-height safety measures?
No
What is the square footage of the area that needs demolition work?
200-500 sq ft
Do you want to add photos to show the work needed? (optional)
Please briefly describe the scope of work (optional)
拆3部3/4匹窗口式冷氣機 和 1部分體式冷氣機
再將其中一部3/4匹窗口式冷氣機安裝 另外3部需除舊
需要在12月11日開工?
安裝地方在同一屋邨旁邊另一楝,會自己搬過去
What time do you prefer to have the service?
Thursday Morning
Anything else that we need to know?
No
Where is your location?
New Territories,Yuen Long