Hong Kong IslandWan Chai江〇生委託:Demolition需求
On which floor do you need demolition?
11th-15th floor
Is there a lift in your building?
Elevator available
What type of demolition work?
Asbestos sheet
What is the square footage of the area that needs demolition work?
1,000-2,000 sq ft
Do you want to add photos to show the work needed? (optional)
Please briefly describe the scope of work (optional)
大約60尺長x3尺闊
位置於天台下
需要搭棚
單位是處於頂樓(出电梯要上一層)
What time do you prefer to have the service?
Any time
Anything else that we need to know?
No
Where is your location?
Hong Kong Island,Wan Chai