Number of paint coats:Wall / ceiling painting (apply standard prepping on all paint surface)
2025/12/9
1. Apartment 2. <300 sq ft 3. Wall with existing paint color 4. Flat surface 5. Latex paint
Drywall
misxxx
Yuen Long
As soon as possible
Square footage:<300 sq ft
2025/12/9
1. Wood frame wall 2. Over 20 years 3. Own property, currently vacant 4. Thursday Any time 5. No
Demolition
Erixxx
Tai Po
Demolition service:Others: 清拆石棉瓦
2025/12/9
1. 2,000-4,000 sq ft 2. No elevator 3. Ground floor 4. Requires working at height safety measures 5. Any time
Description: 1. 清拆石棉瓦 3. 清拆及運走石棉瓦. (要用船) 2500尺
Carpentry
夕
Tsuen Wan
Budget:<$1,000
2025/12/8
Be the first
1. Others 2. Currently occupying 3. I have preliminary idea in mind 4. No paint required 5. Any time
Description: 1. 木門鎖芯開槽
Air Conditioner Installation
蔡〇琪
Yau Tsim Mong
Purchase of air conditioner:Relocating an existing unit to new location
2025/12/8
1. 1 set 2. 1 to 1 split aircon unit 3. Removal of old equipment,Recycle and disposal of old equipment,Need to add electric wires 4. Provide scaffold by Pro 5. Any time