1. Custom build door or furniture,Build ceiling,Others 2. Cabinet,Door 3. Not ready to move in or can not begin remodel4. I have preliminary idea in mind 5. No paint required
1. Peak hour 2. More than 3 3. Date to be confirmed 4. Tuesday Late afternoon.
Wednesday Late afternoon.
Thursday Late afternoon.
Friday Late afternoon.
Saturday Late afternoon 5. No
Description: 1. 包時段
Live Stream Ecommerce
Huixxx
Yau Tsim Mong
Steaming frequency:Others: 商議
Streaming type:Joint brand streaming
2025/11/18
Be the first
1. Food,Care Products 2. Long term cooperation 3. 1 hour 4. Jingdong(JD),TikTok,Xiaohongshu(RED),Weibo
,Instagram,Facebook 5. No preference
Description: 1. 商議
German Translation & Editing
霍〇
Kwun Tong
On specific date: 25.11.30
No. of words:>5,000 (more than 10 pages): 現在口語翻譯
Service type:Others: 現場口語翻譯和後期書面材料整理
2025/11/16
Be the first
1. No 2. Technical manual or instruction 3. Machinery (e.g. mechanical, manufacturing, etc.) 4. Requires special professional trade knowledge 5. Standard turnaround time