1. Connected type 2. 1 set 3. I like to purchase from PROs 4. Existing toilet need to be removed 5. Monday Early afternoon.
Tuesday Early afternoon.
Wednesday Early afternoon
Demolition
鄧
Yuen Long
Demolition service:Brick wall
2025/11/18
Be the first
1. <200 sq ft 2. No elevator 3. 1st-5th floor 4. No 5. Any time
Description: 2. 折水泥牆,228cm闊 265cm高 的水泥牆和頂部份木板
Furniture Recycle
Ms.xxx
Sha Tin
Service date:As soon as possible
Elevator availability:There is a lift in the building, no stairway climbing
2025/11/18
Be the first
1. Sofa,Chair,Table,Bed frame,Mattress,Shelves,Cabinet 2. No 3. New Territories,Sha Tin
Plasterwork
張〇
Tuen Mun
Area:Estimated area size: 約4x5呎
2025/11/18
1. Ceiling plastering 2. Cracked concrete 3. Does not require work-at-height
4. Saturday Early afternoon 5. No