Purchase of air conditioner:I like to purchase with installation from pro
Be the first
1. 1 set 2. Others 3. Non-inverter air-cond 4. No preference 5. <100 sq ft
Description: 1. 二手2匹窗式
Building Inspection
何〇生
Tuen Mun
Building area:1,000-1,500 sq ft
Be the first
1. Renovation inspection 2. Village house 3. As soon as possible4. No 5. New Territories,Tuen Mun
Lighting Installation
S〇〇〇姐
Sha Tin
Type of lamp:Others: LED天花板燈
1. Office area 2. I already purchased light fixture, just need someone to install it 3. No existing fixture to remove 4. The installation requires adding new electrical outlet/wiring 5. I must hire someone
Description: 1. LED天花板燈 2. 燈飾安裝, 安裝辦公室天花板燈10個
Moving
蔡〇
Tuen Mun
Date to be confirmed
Moving services:Standard move service
Be the first
1. New Territories,Tuen Mun 2. New Territories,Tuen Mun 3. I do not need packing boxes 4. Climbing 3 staircases is required 5. No extra service