Type of lamp:There are already lamps, just change the tube/bulb
4/30
1. Office area 2. I would like to purchase lights with installation 3. Need removal of existing fixtures 4. Electrical socket already exist, no new electrical socket required 5. I am just planning
Description: 1. 20光管,樓底約3米
2球場照明燈膽
Lighting Installation
Ms.xxx
Kowloon City
Type of lamp:There are already lamps, just change the tube/bulb
4/30
1. Office area 2. I would like to purchase lights with installation 3. Need removal of existing fixtures 4. Electrical socket already exist, no new electrical socket required 5. I might need someone to help
Description: 1. 20光管、2天花燈、樓底約3米
Iron Door
whixxx
Tuen Mun
Service type:Iron door install
Installation type:Iron (Steel) door
4/30
Be the first
1. No 2. Residence 3. I hope experts can help me purchase door and install it.
4. Sunday Early afternoon 5. No
Description: 1. 新居屋鐵閘
Wall Painting
yanxxx
Tsuen Wan
Number of paint coats:Wall / ceiling painting (economy prepping on all surface)
4/30
1. Apartment 2. <300 sq ft 3. Wall with existing paint color 4. Others 5. Water-based cement paint
Description: 1. 小朋友畫了鉛筆在牆上
Iron Door
崔〇姐
Yau Tsim Mong
Service type:Iron door install
Installation type:Iron (Steel) door
4/30
Be the first
1. Yes 2. Residence 3. I hope experts can help me purchase door and install it.
4. Any time 5. No
Locksmith
陳〇姐
Yau Tsim Mong
Service date:Now/as soon as possible
Service:Lock installation/change
4/30
Be the first
1. Others 2. Roll-up door lock 3. Would like the PRO to purchase and install 4. No 5. Kowloon,Yau Tsim Mong
Description: 1. 地舖捲閘
Wall Painting
夏〇姐
Kwun Tong
Number of paint coats:Wall / ceiling painting (apply standard prepping on all paint surface)
4/30
1. Apartment 2. 600-1,000 sq ft 3. Wall with existing paint color 4. Uneven surface (e.g. broken nails) 5. Latex paint
Description: 1. 屋企剛做完水電 2. 剛做完水電埋線,電制未安裝
Subdivided Flats
Yipxxx
Tsuen Wan
Budget:40(unit: 10k HKD)
Current situation:Just bought the building, will be able to move in within 3 months
4/30
1. Tenement building 2. >50 years 3. 300-900 sq. ft. 4. 4-5 rooms 5. No
Gas Boiler
張
Wong Tai Sin
Service type:Installation
4/30
Be the first
1. TG gas water heater 2. Indoor (e.g. bathroom) 3. Family use 4. I already purchased the heater, only need someone to install it 5. Any time
Gas Boiler
Andxxx
North
Service type:Installation
4/29
Be the first
1. TG gas water heater 2. Indoor (e.g. bathroom) 3. Family use 4. I already purchased the heater, only need someone to install it 5. Wednesday Any time.
Thursday Any time.
Friday Evening.
Saturday Any time