1. Living room 2. Engineered wood floor 3. Yes old flooring needs to be removed 4. Saturday Late afternoon 5. No
Flooring
Allxxx
Eastern
Size of installation:200-500 sq ft
2025/11/29
1. Whole apartment 2. Tile floor 3. Yes old flooring needs to be removed 4. Any time 5. No
Carpentry
K cxxx
Yau Tsim Mong
Budget:>$40,000
2025/11/27
Be the first
1. Build wall or room,Build ceiling,Install wood flooring 2. Empty house and ready for remodel 3. I have preliminary idea in mind 4. No paint required 5. Any time
Description: 1. 木工帶領其他水電泥水照顧整個工程
Flooring
Lesxxx
Eastern
Size of installation:<200 sq ft
2025/11/27
Be the first
1. Office 2. Vinyl floor 3. Yes old flooring needs to be removed 4. Any time 5. No
Flooring
Staxxx
Tuen Mun
Size of installation:<200 sq ft
2025/11/26
Be the first
1. Whole apartment 2. Hardwood floor 3. No removal needed 4. Any time 5. No
Flooring
李〇
Sai Kung
Size of installation:200-500 sq ft
2025/11/25
Be the first
1. Living room,Bedroom 2. Hardwood floor 3. No removal needed 4. Any time 5. No