Freelance Job Center

 
Area
Building Inspection
What's your line of work?
Area

"Building Inspection" results

- 288 freelance jobs

Scaffolding

Phone
張〇生
AreaEastern
其他Height of scaffolding:3-6 floors high
1. External wall   2. Residential building   3. From a ground or a platform   4. Date to be confirmed   5. Yes  
Description: 1. 維修位置在2樓浴室外牆,棚架由地下上落至2樓吊棚工作。  

Ceiling Renovation

Phone
DH xxx
AreaSha Tin
AmountBudget:Have not set budget, would like PRO to recommend
其他Project type:Ceiling installation
1. Aluminum panel   2. Only need ceiling installation,Others   3. <300 sq ft   4. Industrial building   5. 10-20 years  
Description: 1. 一柝一裝,開2-3個燈窿'90平方呎內   2. 廁所  

Scaffolding

Phone
Misxxx
AreaKwun Tong
1. Gas installation   2. Private housing estate   3. From a height   4. Date to be confirmed   5. No  

Moving

Phone
Nicxxx
AreaEastern
TimeAs soon as possible
其他Moving services:Standard move service

Be the first

1. Hong Kong Island,Eastern   2. Hong Kong Island,Eastern   3. I do not need packing boxes   4. There is a lift in the building   5. disassembly of furniture  
Description: 2. 幾件中小型傢俱加一個大櫃,只係同屋苑搬去另一座  

Moving

Ms xxx
AreaKwun Tong
TimeDate to be confirmed
其他Moving services:Standard move service

Be the first

1. Kowloon,Kwun Tong   2. Hong Kong Island,Wan Chai   3. I need packing boxes   4. There is a lift in the building   5. No extra service  

Booster Pump

Phone
AreaWong Tai Sin
其他Booster pump type:Booster pump for hot water boiler

Be the first

1. Install booster pump   2. Please assist to purchase and install   3. Others   4. Monday Early afternoon   5. No  
Description: 1. 政府宿舍  

Subdivided Flats

Phone
Yu xxx
AreaTai Po
AmountBudget:Have not set budget, need PRO to recommend
其他Current situation:Own property, currently living here
1. Private housing estate   2. 30-40 years   3. 300-900 sq. ft.   4. 2-3 rooms   5. No  
Description: 1. 想請師傅安裝門板  

Building Inspection

Phone
Ryaxxx
AreaTuen Mun
其他Building area:<500 sq ft

Be the first

1. New premise inspection   2. Private housing estate   3. Date to be confirmed   4. No   5. New Territories,Tuen Mun  

Scaffolding

Phone
陳〇
AreaEastern
1. External wall,Gas installation   2. Residential building   3. From a height   4. Date to be confirmed   5. No  

Furniture Recycle

Phone
周〇生
AreaSouthern
TimeService date:As soon as possible
其他Elevator availability:There is a lift in the building, no stairway climbing

Be the first

1. Sofa   2. No   3. Hong Kong Island,Southern