1. Puppy (Less than 1 year old) 2. 1 3. Have behavior problems (e.g. too aggressive, overly protective etc.) 4. Obedience,Learn not to bark,Learn not to bite 5. Any time
Description: 1. 邊境牧羊
Washing Machine Cleaning
Ms xxx
Sai Kung
Type of washing machine:Drum type washer and dryer
Be the first
1. Whirlpool 2. 1 set 3. 4-6 years 4. No 5. Monday Early afternoon.
Tuesday Early afternoon.
Wednesday Early afternoon.
Thursday Early afternoon.
Friday Early afternoon
Wall Painting
黃〇
Eastern
Number of paint coats:Wall / ceiling painting (apply standard prepping on all paint surface)
1. Apartment 2. 600-1,000 sq ft 3. Wall with existing paint color 4. Paint peeling 5. Latex paint
Description: 2. 有大形家具及入牆櫃須要保護
Gas Boiler
邱〇宇
North
Service type:Repair
Be the first
1. TG gas water heater 2. Indoor (e.g. bathroom) 3. Family use 4. Unstable circuitry 5. Any time
Move-in Cleaning
Samxxx
Sha Tin
Service type:Move-in cleaning
1. 200-500 sq ft 2. 1 3. Any time 4. No 5. New Territories,Sha Tin
Gas Boiler
蕭〇
Eastern
Service type:Repair
Be the first
1. TG gas water heater 2. Indoor (e.g. bathroom) 3. Family use 4. I am not sure 5. Monday Evening.
Tuesday Evening.
Wednesday Evening.
Thursday Evening.
Friday Evening.
Sunday Any time
Description: 1. 平日維修需要晚上8點後
多田牌熱水爐
出咗E14 呢個code
Furniture Recycle
Catxxx
Eastern
Service date:As soon as possible
Elevator availability:There is a lift in the building, no stairway climbing
Be the first
1. Cabinet 2. No 3. Hong Kong Island,Eastern
Mural Painting
Alexxx
Central and Western
Timeline:Others: 1-2個月左右
Design style:American comic style
1. Public space 2. Outdoor wall,Others 3. Concret wall with existing paint layer 4. I have a brief idea 5. Landscape
Description: 1. 幾幅牆以及橋底 3. 1-2個月左右 4. 有部分位置有6米以上
Wall Mold Removal
張〇〇〇)
Tuen Mun
Water Leakage:Others: 全棟污水渠已更換,水源問題應已處理。外牆磚甩掉,管理處答應處理。
1. Wall mold removal,Others 2. Bathroom/Toilet,Around windows 3. Monday Any time 4. No 5. New Territories,Tuen Mun