1. Living room 2. Engineered wood floor 3. Yes old flooring needs to be removed 4. Saturday Late afternoon 5. No
Flooring
Allxxx
Eastern
Size of installation:200-500 sq ft
1. Whole apartment 2. Tile floor 3. Yes old flooring needs to be removed 4. Any time 5. No
Carpentry
K cxxx
Yau Tsim Mong
Budget:>$40,000
Be the first
1. Build wall or room,Build ceiling,Install wood flooring 2. Empty house and ready for remodel 3. I have preliminary idea in mind 4. No paint required 5. Any time
Description: 1. 木工帶領其他水電泥水照顧整個工程
Flooring
Lesxxx
Eastern
Size of installation:<200 sq ft
Be the first
1. Office 2. Vinyl floor 3. Yes old flooring needs to be removed 4. Any time 5. No
Flooring
Staxxx
Tuen Mun
Size of installation:<200 sq ft
Be the first
1. Whole apartment 2. Hardwood floor 3. No removal needed 4. Any time 5. No
Flooring
李〇
Sai Kung
Size of installation:200-500 sq ft
Be the first
1. Living room,Bedroom 2. Hardwood floor 3. No removal needed 4. Any time 5. No