1. I am not sure 2. Family use 3. I already purchased the heater, only need someone to install it 4. Monday Any time 5. Yes
Description: 1. 要安裝和拆卸
Lighting Installation
lamxxx
Kwai Tsing
Type of lamp:Ceiling Lamp
5/4
1. Apartment 2. I would like to purchase lights with installation 3. No existing fixture to remove 4. The installation requires adding new electrical outlet/wiring 5. I am just planning
Confinement
Isaxxx
Yuen Long
On specific date: 16/06
Type of service:Baby care only
5/2
Be the first
1. Cesarean 2. 1 3. Professional license is required 4. 6-8 hrs 5. Any time
Description: 1. 16/06 2. 唔怕狗(有一隻貴婦)
Plumbing
Olixxx
Macau Peninsula
Location of clogged:Pipe drainage
5/2
1. I am not sure 2. 1-2 days 3. Monday Morning 4. No 5. Macau,Macau Peninsula
Pest Control
楊〇姐
Sha Tin
Type of service:I am not sure
5/2
1. Apartment 2. All areas 3. 300-600 sq ft 4. Any time 5. Yes
Description: 1. 發現有少少木被蟲蛀,需要檢查成間屋,再提供什麼方法處理
Event Photography
Tinxxx
Central and Western
Event date:Date to be confirmed: 7月1/5/6
Budget:<$500/hr
5/2
1. I am considering to hire a photographer 2. Others 3. 2-3 hours 4. <25 people 5. Outdoor
1. Apartment 2. I already purchased light fixture, just need someone to install it 3. Need removal of existing fixtures 4. Electrical socket already exist, no new electrical socket required 5. I am just planning
Lighting Installation
Wilxxx
Tai Po
Type of lamp:Ceiling Lamp
5/1
1. Apartment 2. I already purchased light fixture, just need someone to install it 3. Need removal of existing fixtures 4. Electrical socket already exist, no new electrical socket required 5. I am just planning
Description: 1. 小風扇燈
Lighting Installation
Wilxxx
Tai Po
Type of lamp:Ceiling Lamp
5/1
1. Apartment 2. I already purchased light fixture, just need someone to install it 3. Need removal of existing fixtures 4. Electrical socket already exist, no new electrical socket required 5. I am just planning
Description: 1. 2 2. 小風扇燈
Waterproof Works
Mr.xxx
Sai Kung
Square footage:300-600 sq ft
4/30
Be the first
1. Others 2. To be discussed with the PRO 3. No, all work is on ground floor 4. I am not sure 5. Any time