1. Internal wall plastering,External wall plastering,Ceiling plastering,Floor plastering,Tile installation,Partition Walls 2. No issues, just need construction 3. Requires work-at-height 4. Any time 5. No
Description: 2. 間牆,內外批蕩,貼瓦仔 3. 2,100呎
Scaffolding
譚〇
Tai Po
Height of scaffolding:3-6 floors high
9/7
1. Window 2. Village house 3. From a ground or a platform 4. As soon as possible 5. No
Air Conditioner Repair
Mr.xxx
Sha Tin
No. of air conditioner:1
9/6
1. Maintenance 2. Split type 3. Not cold or warm enough 4. More than 10 years 5. No