Repair issue:Floor bulging or lifting,Floor split or cracked
2025/12/16
Be the first
1. Engineered wood 2. <200 sq ft 3. Wednesday Morning, Early afternoon 4. No 5. Hong Kong Island,Southern
Furniture Recycle
Kanxxx
Kwai Tsing
Service date:As soon as possible
Elevator availability:There is a lift in the building, no stairway climbing
2025/12/16
Be the first
1. Others 2. No 3. New Territories,Kwai Tsing
Description: 1. 醫療床
Marble Installation
馮〇生
Central and Western
Project Size:Small area
2025/12/16
Be the first
1. Marble crack repair 2. Residence 3. Others 4. Wall 5. Any time
Description: 1. 廁所
Lighting Maintenance
hadxxx
Yau Tsim Mong
Lamp repair:Does not turn on
2025/12/16
1. Others 2. 2-5 3. Any time 4. No 5. Kowloon,Yau Tsim Mong
Description: 1. 小射燈 3. 位於白色燈罩內的小射燈熄了,需要更換。
Drywall
Ms xxx
Central and Western
Date to be confirmed
Square footage:<300 sq ft
2025/12/16
1. Ceramsite concrete wall 2. Over 20 years 3. Just bought the apartment, will be able to move in within 3 months 4. No 5. Hong Kong Island,Central and Western