Number of paint coats:Wall / ceiling painting (only partial surface prepping is needed)
3/25
1. Office 2. <300 sq ft 3. Wall with existing paint color 4. Flat surface 5. Water-based cement paint
Refrigerator moving
Aarxxx
Kwun Tong
Date:Date to be confirmed
Refrigerator type:Double door
3/25
Be the first
1. Move to other location 2. 1 3. Kowloon,Kwun Tong4. Kowloon,Kwun Tong5. Not sure. Ask PRO to check
Furniture Repair
馬〇
Kwai Tsing
1
3/25
Be the first
1. Table2. Monday Late afternoon.
Tuesday Late afternoon.
Wednesday Late afternoon.
Thursday Late afternoon.
Friday Late afternoon 3. No 4. New Territories,Kwai Tsing
Description: 1. 枱面木皮凹凸
Swimming Classes
Chexxx
Yuen Long
Lesson frequency:Once a week
Lesson frequency:60 mins
3/25
1. Male2. Under 6 years old 3. 1 person 4. No prior experience 5. Freestyle,Breaststroke
Clothing Alteration
Tsuxxx
Sha Tin
Completion date:Before specific date: 10/4/2026前
3/25
Be the first
1. Formal dress / gown 2. 1 3. Fit adjustments 4. No 5. New Territories,Sha Tin
Description: 1. 10/4/2026前
Furniture Recycle
Ms xxx
Yuen Long
Service date:As soon as possible
Elevator availability:At ground floor, no stairway climbing
3/25
Be the first
1. Cabinet 2. No 3. New Territories,Yuen Long
Water Leakage Repair
Ng xxx
Tsuen Wan
Place:Residence
3/25
Be the first
1. Wall,Bathroom/Toilet 2. Constantly leaking all day 3. Within six months 4. Any time 5. No