1. <200 sq ft 2. 2 hours (studio only) 3. 1 bathroom 4. No preference 5. I don't need other add-on service
Camera Repair
Edyxxx
Kwun Tong
Finish time:As it needs to take
Repairing numbers:1
Camera type:Mirrorless camera (MILC)
Be the first
1. Canon 2. None of the above 3. Others 4. No 5. Kowloon,Kwun Tong
Description: 1. Ixus300hs 2. 螢幕有花 3. 有一小部份螢幕花了
House Cleaning
Balxxx
North
Cleaning frequency:One time cleaning
Cleaning type:Move cleaning
1. 500-1,000 sq ft 2. 6 hours 3. 1 bathroom 4. No preference 5. I don't need other add-on service
Taobao Furniture Assembly
黎〇姐
Sai Kung
Furniture Number:>3: 2件雙層床;2件雙人床
Furniture Type:Bed
1. Not sure 2. New furniture arrived already 3. Packaging materials 4. Any time 5. No
Description: 1. 2件雙層床;2件雙人床
Microblading
Chrxxx
Wong Tai Sin
Service time:Date to be confirmed
Services type:Scalp/ ********line embroidery
Be the first
1. Scalp/hairline embroidery 2. Recommended by PRO 3. No 4. Kowloon,Wong Tai Sin
Camera Repair
Misxxx
Tsuen Wan
Finish time:As it needs to take
Repairing numbers:1
Camera type:Single-lens reflex camera (DSLR)
Be the first
1. Sony 2. None of the above 3. Shooting issues 4. No 5. New Territories,Tsuen Wan
Description: 1. Sony A900 2. 主體鏡片脫落
Lighting Installation
林〇姐
Yuen Long
Type of lamp:Ceiling Lamp
1. Apartment 2. I already purchased light fixture, just need someone to install it 3. Need removal of existing fixtures 4. Electrical socket already exist, no new electrical socket required 5. I might need someone to help
Description: 1. 需拆除舊燈, 裝新燈(圓形:直徑60cm)
Interior Design
霍〇
Yau Tsim Mong
Budget:120 (unit: 10k HKD)
1. Residential apartment 2. Private residence 3. 1,000-2,000 sq ft 4. The whole apartment 5. Already purchased and closed
Description: 1. 我需要女性设计师
Air Conditioner Installation
cy xxx
Wong Tai Sin
Purchase of air conditioner:Relocating an existing unit to new location
Be the first
1. 1 set 2. Window type 3. Removal of old equipment 4. Don't need to provide scaffold 5. Any time
Waterproof Works
Mr.xxx
North
Square footage:<300 sq ft
1. Exterior wall 2. Dismantling required 3. No, all work is on ground floor 4. Yes, waterproofing has been done before 5. Wednesday Any time