1. Aluminum panel 2. Only need ceiling installation 3. <300 sq ft 4. Private housing estate 5. 0-5 years
Post Renovation Cleaning
伍〇生
Yau Tsim Mong
Service date:On specific date
Size of area:<300 sq ft
2025/12/3
1. Apartment 2. Yes, construction waste has been removed 3. 06/01/2026 Any time.
07/01/2026 Any time.
08/01/2026 Any time 4. No 5. Kowloon,Yau Tsim Mong
Demolition
黃〇
Tsuen Wan
Demolition service:Others: 強力膠清理
2025/12/3
1. <200 sq ft 2. Elevator available3. 11th-15th floor 4. No 5. Any time
Description: 1. 強力膠清理 3. 有啲用強力膠黐咗嘅嘢要拆咗清返俾業主
Furniture Recycle
Andxxx
Yau Tsim Mong
Service date:Date to be confirmed
Elevator availability:There is a lift in the building, no stairway climbing
2025/12/3
Be the first
1. Sofa,Mattress,Bed frame 2. Any time 3. No 4. Kowloon,Yau Tsim Mong
Iron Door
蘋〇
North
Service type:Iron door repair
2025/12/3
Be the first
1. Iron (Steel) door 2. The door does not open and close smoothly
3. Residence4. Any time 5. No
Description: 1. 門約為213 cm x 99cm ,
趟門要用力向上托高才能趟開,
頂部似有螺絲鬆脫如圖,
維修位置在上水名都高層(有?),
請報價,謝謝