1. High-level (for score 6.0 or above) 2. Speaking skill,Listen comprehension,Vocabulary,Reading,Grammar,Writing 3. 19-25 years old 4. Female5. 60 mins
Fiber Optic Cable Installation
Li xxx
Yuen Long
Environment:Res id********
Be the first
1. Wiring on the same floor 2. Wired network only 3. Any time 4. No 5. New Territories,Yuen Long
Description: 1. 接驳光纖頭
Water Tank Cleaning
吳〇姐
Sha Tin
Number of tanks:5 tanks
Be the first
1. Others 2. Up to 6 floors 3. Potable water tank,Fire safty water tank 4. Concrete, tile5. Rooftop