Budget:Have not set budget, would like PRO to recommend
Project type:Ceiling installation
2025/10/26
1. Aluminum panel 2. Plumbing and electricity,Plastering,Tiles/Wooden floor,Painting/Wallpaper,Carpentry/Custom cabinet 3. 500-700 sq ft 4. Private housing estate 5. >20 years
Description: 1. 鋁窗全換
Flooring Repair
Lulxxx
Sha Tin
Repair issue:Others: 拆加裝
2025/10/25
1. Others 2. 200-500 sq ft 3. Any time 4. No 5. New Territories,Sha Tin
Description: 1. 地板 2. 拆加裝
Ceiling Fan Light Installation
梁〇
Kwai Tsing
Ceiling fan light type:Enclosed ceiling fans
2025/10/25
1. 1 2. Already have a light and only need expert to install it
3. 7 feet-9 feet 4. Remove existing light fixtures 5. Any time
Click Lock Floor
Sunxxx
Yuen Long
Floor material:SPC(Stone Polymer Composite) floor
2025/10/25
1. Whole apartment
2. <200 sq ft 3. No 4. Any time 5. No
SPC Flooring
Mr xxx
Tuen Mun
Installation size:<200 sq ft
2025/10/25
1. Others 2. Cement 3. No 4. Would like the PRO to purchase and install 5. Wednesday Any time
Description: 1. 公屋14x14呎
Demolition
mikxxx
Kwun Tong
Demolition service:Others: 露台窗下欄杆
2025/10/25
Be the first
1. <200 sq ft 2. Elevator available 3. Above 20th 4. Requires working at height safety measures 5. Any time
Description: 1. 露台窗下欄杆 3. 清拆欄杆改砌磚
Plasterwork
陳〇
Tsuen Wan
Area:Estimated area size: 1
2025/10/24
1. Floor plastering 2. Tile protrusion 3. Any time 4. No 5. New Territories,Tsuen Wan
Description: 2. 拆除地台約2cm,然後整平 3. 1
Vinyl Flooring
Lizxxx
Macau Peninsula
Installation size:>2,000 sq ft
2025/10/24
1. Commercial space 2. Others 3. Yes, already have material, only need the PRO to install 4. No 5. Macau,Macau Peninsula
Description: 1. 膠地板
Office Cleaning
Calxxx
Yau Tsim Mong
Office size:3,000-4,000 sq ft
Floor material:Vinyl / laminate
2025/10/24
1. Floor cleaning and vacuuming 2. <10 3. We do not need disinfection and pest control service 4. No floor polishing service needed 5. One time cleaning
Demolition
葉〇姐
Southern
Demolition service:Others: 平台
2025/10/24
1. 2,000-4,000 sq ft 2. Elevator available 3. 1st-5th floor 4. Requires working at height safety measures 5. Any time